IGS Geotechnical Services LLP – Engineers & Consultants

Projects
Check our completed projects showcasing innovative geotechnical solutions that ensure stability and success for various construction and infrastructure endeavors.

Important River Bridges (Highways)
1 Soil Investigation for Delhi-Noida Bridge (Toll Bridge) over River Yamuna connecting Delhi & Noida.
2 Soil Investigation for Cable Stayed Bridge across Yamuna at Naini, Allahabad
3 Geotechnical Investigation for Cable stayed bridge over River Yamuna (Signature Bridge) downstream of existing bridge at Wazirabad, Delhi
4 Soil Investigation for Yamuna Bridge in Agra for Agra Ring Road Project.
5 Geotechnical Investigation for Major bridge across river Ganges (Mahatma Gandhi Setu) connecting Bakhtiyarpur to ShahpurPataori in Bihar
6 Geotechnical Investigation for Major Bridge over River Sone and Ganga on Patna Buxer Section of NH - 30 in Bihar
7 Geotechnical Investigation for Major Bridges over River Sutlej and Beas in Punjab
8 Geotechnical Investigation on land along the alignment of the proposed 'Chambal Bridge' Kota, Rajasthan
9 Geotechnical Investigation for Ganga & Yamuna Major River Bridge in Agra-Lucknow Expressway Highway Project.
10 Geotechnical Investigation for bridge over Godavri River, Nizamabad,
11 Geotechnical Investigations for Major Bridges across River Yamuna and Gandak (Eastern Peripheral Expressway)
11 Geotechnical Investigation for Construction of Four Lane Bridge with footpath cross River Ganga between Sultanganj (Bhagalpur District ) and AguwaniGhat (Khagaria District) including navigational span of cable stayed and approaches (connecting NH-31 and NH-80) in the State of Bihar on EPC mode
12 Geotechnical Investigation for construction of four lanes with paved side shoulder of Harike Bypass of NH-15 from existing km 158.350 to Km 166.925 in the state of Punjab under NHDP-IV - Major bridge over Sutlaj River
13 Soil Investigation work for Design & Construction of bridge over River ganga from NH-31 to ShivpuriDiyarNamberiMarg, at Sri Rampur Ghat in Distt. Ballia, UP.
14 Geotechnical Investigation work at construction of Yamuna Bridge at Km.34.84 on Agra ? Lucknow Expressway, FatehabadDistt. Agra, U.P
15 Geotechnical Investigation for Construction of High Level Bridge over River Mahanadi connecting Cuttack city to Nuapatana in the Distt. Of Cuttack in the state of Odisha on EPC basis.
16 Geotechnical Investigation for Ganga River Bridge for Four lanning of Bhojpur to Buxer Km 27.370 to Km 75.00 (Design Chainage Km 77.100 to Km 125.00) in the state of Bihar under NHDP Phase-III on EPC mode.
17 Construction of Substructure, Superstructure and River Training / Protection works for Rail cum Road Bridge over river Ganga between Ghazipur&Tarighat in connection with construction of New BG kine from Mau to Tarighat? in The State of Uttar Pradesh
18 Four / Six laning of Aunta - Simaria (Ganga Bridge with approach road) section of NH-31 from km 197.900 to 206.050 (design chainage) and (existing chainage km 204.741 to km 209.945 of NH- 31) [total design length - 8.150 km]" in State of Bihar
19 Construction of dedicated corridor (4 lane including extradose bridge river Ganga) of old, differently abled persons during Kumbh and Maghmela at Sangam, Allahabad
20 Geotechnical Investigation for Construction of Major Bridge Across Thane Creek (TCB III) - South
21 Geotechnical Investigation for "Design and Construction of Iconic Bridge (6 lanes) on EPC Basis Over River Krishna at Amaravati, Andhra Pradesh- in-progress.
22 Geotechnical Investigation for Versova-Bandra Sea Link Project
23 Geotechnical Investigation For Construction Of New 6-Lane Bridge With Approaches Parallel To Existing 2-Lane Bridge Over River Ganga At Phaphamau Near Allahabad In The State Of Uttar Pradesh
24 Geotechnical Investigation For New 4-Lane Bridge (Parallel To The Existing Mg Setu) With The Approaches From Km 0/000 To Km 14/500 Across River Ganga On Nh-19 At Patna In The State Of Bihar
25 Geotechnical Investigation Report For Construction Of Extra-Dosed Psc Bridge Over River Brahmaputra Connecting Guwahati And North Guwahati Including Via-Duct And Approaches Etc. On Epc Mode
26 Geotechnical Investigation for Construction of New 2-lane Bridge (Parallel to the Existing Naranarayan Setu) from km 0.000 to km 4.385 including approach road 50 m on Jogighopa side & 1990 m on Guwahati side across river Brahmaputra on NH-17 at Jogighopa in the State of Assam
27 Geotechnical Investigation for Construction of new 2-Lane Major Bridge including approaches over Brahmaputra River between Majuli on North Bank and Jorhat on South Bank from Km.11 .69To Km. 19.715. (Length of Bridge: 6812.50 Mtr)

Highway Projects
1 Consultancy Services for Geotechnical Investigation on 'Four laning of Kallagam to Karuppur from km. 38.700 to km. 50.382 and Two laning with paved shoulders from Karuppur to Meensurutti from km. 50.382 to km. 98.433 under NHDP phase - IV on Hybrid Annuity Mode in the state of Tamil Nadu
2 Consultancy Services for Geotechnical Investigation on 'Four Laning of Viluppuram to Puducherry Section of NH-45A in the State of Tamil Nadu
3 Consultancy Services for Geotechnical Investigation on 'Development of Purvanchal Expressway (Package-VIII) From Bijaura (Dist. Ghazipur) to Haidariya (Dist. Ghazipur) (Km 292+530 to Km 340+500) in the State of Uttar Pradesh on EPC Basis
4 Consultancy Services for Geotechnical Investigation on ' Six Laning & Strengthening of New NH-248A from existing Km 2+740 (Rajiv Chowk) to Km 11+682 in Gurgaon under NHDP Phase IV on Hybrid Annuity Mode (HAM) in the State of Haryana
5 Consultancy Services for Geotechnical Investigation for Rehabilitation and Up-gradation to Four Laning of Binjhabahal to Telebani Section, Km 414.000 to Km 491.710 (Design Chainage Km 414.982 to Km 493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP - IV, on Hybrid Annuity Mode
6 Consullancy Services for Soil investigation work on existing Yamuna River Bridge of NH-2 for "Six- Laning of Agra - Etawah Bypass from Km 199.660 to Km 323.525 in the State of Uttar Pradesh under NHDP Phase V on BOT (Toll) Mode
7 Providing Consultancy Services for Geotechnical Investigation_Vadodra-Mumbai (PKG-13)
8 Providing Consultancy Services for Geotechnical Investigation for ' Construction of Eight Lane Carriageway Talasari-Kim Expressway from Km 217+500 to Km 254.430 (Ena to Kim section of Vadodara-Mumbai Expressway) in the State of Gujrat
9 Construction of Eight Lane Carriageway starting at Haryana-Rajasthan border and ends at Junction with SH44 (Km 78+800 to Km 115+700) section of Delhi - Vadodara Green field Alignment (NH-148N)on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode_Work Order for Detailed Geotechnical Investigation
10 Soil Investigation for 'Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch. 331.030 - 359.170) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
11 Construction of Eight Lane Access-Controlled Expressway Carriageway from Kamliya To Kandarwasa of Ratlam Design Ch.119.800 to Ch.150.000) Delhi-Vadodara on EPC Mode Under Bharatmala Pariyojana In State of MP
12 Construction of Eight Lane Access-Controlled Expressway Carriageway From Bawadi Village (Near Shivgarh) (Km 175+000) of Ratlam District to Ranni Village of Jhabua (Km 200+300), Delhi - Vadodara (NH-148N) Section of Delhi-Vadodara Green Field Alignment (Pkg-23) on EPC Mode Under Bharatmala Pariyojana in State of MP
13 6-Laning of Handia Varanasi section of NH-2 from km 713.146 to km 785.544 in the State of Uttar Pradesh under NHDP Phase-V on Hybrid Annuity Mode
14 Four Laning of Phagwara-Rupnagar section of NH-344A from Km 0.00 (Design Chainage) to Km 80.820 (Design Chainage) in the state of Punjab in Hybird Annuity Mode.
15 Design and Construction of Delhi-Meerut Expressway from dasna to Meerut - Km. 27.740 of NH-24 to Km. 51.975 of NH-58 (Design Chainage 28+000 to 59+777) in the state of Uttar Pradesh on EPC Basis (Length 31.777Kms)_Geotechnical Investigations
16 Geotechnical Investigation for Construction of 6 lane NH-344M - Package 1 (From NH 1,Km -0+700 to Karala-Kanjhawala Road, Km 15+000)in State of Delhi on EPC mode. (Pkg-1)
17 Geotechnical Investigation for Construction of Proposed Rewari Bypass (Design length 14.4 km) as a feeder route in the state of Haryana on Hybrid Annuity Mode(Package -IV)
18 Geotechnical investigation work for 'Annual Rate Contract - Construction of 6-lane access controlled Green field Highway from Km. 140.000 to Kmn 170.000 of Sangariya (Near Chautata)- Rasisar (Near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC Mode under Bharatmala Pariyojna (Phase-I) (AJ-SR-PACKAGE-6)
19 Geotechnical Investigation for development of Development of UER-2 between Design Chainage km 28+450 to 38+111.43 (Package-3) in the State of Delhi
20 Geotechnical Investigations for 'Construction of Elevated Structures including Approaches from Km 352+675 to Km 354+430 and VUP at Km 355+400 including approaches on NH-44 at Phagwara City in Sthe State of Punjab
21 Geotechnical Investigations for 'Construction of Eight Lane Carriageway starting near Junction with NH11 and ends after new railway line (under construction) (Km 183+000 to Km 214+260) section of Delhi - Vadodra Access Controlled Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
22 Geotechnical Investigations for 'Construction of Four Lane Champa Korba Katghora section of NH-149B from design ch. 0+000 to ch. 38+200, (From NH- 49 near Saragaon village to Bhaisma village) under NH (O) in the State of Chhattisgarh on HAM Mode
23 Geotechnical Investigations for '4- Laning of Dewas Ujjain section of Old SH18 from Design Ch. 0+000 to 19+733, Construction of 4-Lane Ujjain Bypass from Design Ch. 19+733 to 26+900 (Part I) and construction of 4-Lane Dewas Bypass from Design Ch. 0+000 to 14+520 (Part II) having total Design Length: 41.42 km in the State of Madhya Pradesh on HAM Mode
24 Consultancy Services for Geotechnical Investigation on 'Four laning of Kallagam to Karuppur from km. 38.700 to km. 50.382 and Two laning with paved shoulders from Karuppur to Meensurutti from km. 50.382 to km. 98.433 under NHDP phase - IV on Hybrid Annuity Mode in the state of Tamil Nadu
25 Geotechnical Investigation for Vadodara- Mumbai Expressway Package 13
26 Geotechnical Investigation for 'Construction of Four Laning of Rajauli-Bakhtiyarpur Section of New NH-20 (Old NH-31) Package-2 and 3
27 Geotechnical Investigation for Construction of Eight Lane access controlled Expressway from Hardeoganj village near Indergarh to Major Bridge on river (CH 319.400 to 331.030) (PKG-11) section of Delhi - Vadodara Green field Alignment (NH-148N) in the state of Rajasthan.
28 Geotechnical Investigation for 09 Packages of Amravati Akola AM-2 Project in Maharashtra.
29 Geotechnical Investigation for Construction of 8 lane Dwarka Expressway (NH-248BB PACKAGE IV from Rail Over bridge (ROB) till End point Km 40 NH-8-SPR intersection near Kherki Daula of 8.76 Km length, from Km 19.700 to Km 28.460 in the State of Haryana on EPC Mode
30 Geotechnical Investigation for Consultancy services for upgradation to 4-lane of Shimla to Mataur of NH-88 in the state of Himachal Pradesh
31 Geotechnical Investigation for four laning of Aunta - Simaria Ganga Bridge NH-31 in the State of Bihar
32 Four Laning of Chikhali-Tarsod (Pkg IIA) section of NH 6 from km 360.000 to 422.700 in the state of Maharashtra- for Geotechnical Investigation
33 Construction of Partially access controlled four lane elevated highway between SamralaChowk to Ludhiana Municipal Limit of NH-95 in the state of Punjab
34 Geotechnical Investigation for Delhi - Meerut expressway from km. 0.000 to km. 27.500 including 6/8 laning of NH-24 from km. 0.000 to km. 49.346 (Hapur bypass) in the state of Delhi and Uttar Pradesh - Package I - from existing km. 0.000 to existing km. 8.360 (Delhi up to UP border) in the state of Delhi on Hybrid Annuity Mode.
35 Geotechnical Investigation work for Babatpur - Varanasi, Uttar Pradesh
36 Geotechnical Investigation for development of six-lane Eastern Peripheral Expressway (NH-2) in the states of Haryana and Uttar Pradesh Package-V from km 93.000 to 114.000 on EPC mode.
37 Geotechnical Investigation & testing of soil & rock samples for development of ROBS IN LIEU OF LEVEL CROSSINGS HAVING TVU > 100,000 in state of Gujarat on BOTAnnuity Bassis.
38 Geotechnical Investigation works of Four laning of Ramban - Banihal section of NH-1A (New-44) from km - 151.00 to km- 187.00 in the state of Jammu & Kashmir under NHDP Phase II, on Engineering, Procurement & Construction (EPC) Mode.
39 Geotechnical Investigation for Design Consultancy Services for 8 Laning of section of NH-1 (New NH-44) (MukarbaChowk at Km 15.500 to Panipat Km 86.000) at MukarbaChowk.
40 Geotechnical Investigation for Preparation of Feasibility Report cum Detailed Project Report (DPR) for Capacity Augmentation to 2 lanes with paved shoulders configuration of National Highways in the State of Uttar Pradesh for Package - I (Km 0.00 to 128.00 of NH-19) (Length 128 km).
41 Geotechnical Investigation for Preparation of Feasibility cum Detailed Project Report for four laning of Ropar - Nawashahir-Banga-Phagwara Section of NH-344A in state of Punjab on EPC mode.
42 Geotechnical Investigation of Estern Peripheral Express Highway (NH-2)
43 Geotechnical Investigation for four laning of Jamugurihat to end of BiswanathChariali By-pass from Km. 182.00 - Km. 208.00 of NH-52 in the state of Assam Under SARDP - NE Phase -A.
44 Geotechnical Investigation for Jhansi - Banda - Allahabad - Mirzapur Section of Road (UP).
45 Geotechnical Investigation & Testing of Soil & Rock Samples at Proposed Structure Locations from Km. 30+000 to Km. 55+000 of Proposed Kathmandu - Nijgadh - Pathlaiyaterai / Madhes Expressway in Nepal.
46 Geotechnical Investigation for Preparation of design and drawings of road project from DogalKalan to Punjab / Haryana border Section of NH-71 from km 211.390 to km. 238.695.
47 Geotechnical Investigations and the Client are a firm of civil engineering consultants and have agreed to appoint the consultant to provide consultancy services pertaining to Topographic Survey for the Four / Two Lanning of Bikaner - Kolayat - Phalodi section of NH-15
48 Geotechnical Investigation for the preparation of feasibility report for package 8 i.e. Two laning with paved shoulder Km. 105 to Km. 174 of SH-32, comprising the section from Udaipur to Salumber (the 'Highway-I"); (ii) Km. 35 to Km. 212 of SH-62 comprising the section from Sojat to Pindwara (the 'Highway-II"); and (iii) Km. 37 to Km. 130 of MDR-26 comprising the section from Jasawantpura to Bhinmal - ChanchwaPhata (the 'Highway-III"); totaling 323 Kms.
49 Soil Investigation for the project for construction part alone of DTP Drain, BOX Culvert and allied works in Dibrugarh From Chainage 0 to 9500.
50 Geotechnical Investigation for preparation of detailed project report (DPT) for up-gradation of road corridors (Package III) on DBFOT basis in Punjab state - Package III B - additional consultancy work for the connecting roads to high level bridge (under construction) over river Sutlej at Mattewara.
51 Soil Investigation for construction part alone of DTP drain, box culvert and allied works in Dibrugarh from Chainage 0 to 9500m.
52 Soil testing for Prebid services- '4 laning of Numaligarh to Jorhat section of NH-37 from km. 402.500 to km. 453.00 (Design Chainage from ch 403.200 to Ch. 454.240) Excluding Desgaon Bypass from km 426.800 to km 437.420 (Design Ch. 427.400 to Ch. 438.720)" in the state of Assam,
53 Geotechnical Investigation of Preparation of Feasibility cum Detailed project report for balance works in 4-laning of Pathankot - Jammu section from Km. 80.00 to Km. 97.200 and Jammu Bypass including construction of new 2-lane Debak Bridge in Km. 78.00 on NH-44 (Old NH-1A) in the State of Jammu & Kashmir
54 Geotechnical Investigation works along NH-58 from Km. 6.800 (Delhi-UP Border) to Km 52.528 (Meerut Bypass)
55 Geotechnical Investigation / Consultancy Services for Preparation of Feasibilty Report for Upgradation of Kalewa - Yargy Road Section in Myanmar
56 Geotechnical Investigation works for preparation of Feasibilty of Four-Laning of Indore-Icchapur section of SH-27 in the state of MP.
57 Geotechnical Investigation at Flyover Locations for Delhi Agra Road Project
58 Geotechnical Investigation for proposed structure location of Milak Bypass of Moradabad Bareilly Section of NH-24 in the state of Uttar Pradesh
59 Geotechnical Investigation for Preparation of Feasibility Report cum Preliminary Design of National Highway 162 starting from Charbuja, Connecting Kumbalgarh, Haldighati, Nathwara, Mavli and terminating at Bhaterver on NH-27 in the state of Rajasthan.
60 Geotechnical Investigation for Construction of Flyover at Hero Honda Chowk on NH-8 at Km. 36+200 on Delhi-Gurgaon Expressway
61 Geotechnical Investigation work for Preparation of DPR for Up-gradation of Roads in Punjab (Package IIIA & IIIB)
62 Geotechnical Investigation work for Construction of flyover at Hero Honda Chowk on NH-8 at Km 36+200 on Delhi-Gurgaon Expressway.
63 Geotechnical Investigation for proposed structure location of Milak Bypass of Moradabad Bareilly Section of NH - 24 in the state of UP
64 Geotechnical Investigation work for NH-6 near Fulgaon Village, Jalgaon on deposit work for MSPGCL.
65 Geotechnical Investigation & testing of soil & rock samples at proposed structure location of Khed-Sinnar Section of NH-50 in Maharashtra
66 Geotechnical Investigation work for flyovers/rail over Bridge (ROB) at Dehradun, Uttarakhand
67 Geotechnical Investigation for Ring Road / Bypass around Srinagar City in J&K
68 Geotechnical Investigation work for 4-laning of Kashipur to Sitarganj Section of NH-74, UK
69 Geotechnical Investigation of One ROB/Bridge and Three Flyover at Itanagar, Arunachal Pradesh.
70 Geotechnical Investigation and testing of soil & rock samples for the structure of Kiratpur - NerChawk Section of NH-21 in HP
71 Geotechnical Investigation of Bikaner - Suratgarh Section of NH-15 in the state of Rajasthan
72 Geotechnical Investigation of Six No. of Bypasses on Gurgaon-Kotputli-Jaipur section NH-8 in the state of Haryana and Rajasthan
73 Geotechnical Investigation for preparation of DPR for rehabilitation and upgrading to 2-lane with pave shoulders configuration of NH-71, from Jind - Jalandhar in the Station of Haryana & Punjab - Addendum-III
74 Geotechnical Investigation of Raebareli-Jaunpur section of NH-231 in the state of Uttar Pradesh
75 Geotechnical Investigation of Aurangabad to BarwaAdda section on NH-2 From Km. 249.770 to 276.000 And Km. 276.000 to 320.800 in the state of Westbengal
76 Geotechnical Investigation for four laning of Lucknow - Raebareli section from Km. 12+700 to Km. 82+700 of NH - 24B in the state of Uttar Pradesh under NHDP Phase IV A on DBFOT (Annuity) Basis
77 Geotechnical Investigation of 4/6-Laning of Raipur-Bilaspur Section of NH-200 from Km. 0.00 to Km. 127+650 in the state of Chattisgarh under NHDP Phase - IV on DBFOT basis.
78 Geotechnical Investigation of Six Laning of Jaipur Ring Road from Ajmer Road to Agra Road section at Jaipur in the state of Rajasthan on DBFOT (Toll) basis (approx 47 Km length.
79 Geotechnical Investigation for widening and strengthening of the existing 2-lane road to a 4-lane divided carriageway from Km 256+550 (Kota) to Km 289+560 (Darah) and 2-lane Paved Shoulder from Km 289+560 (Darah) to Km 346+539 (Teendhar) Section of NH-12 on BOT Tool under NHDP Phase - III in the State of Rajasthan.
80 Geotechnical Investigation of Six Laning of Etawah-Chakeri Section of NH-2 in the state of Uttar Pradesh
81 Geotechnical Investigation of for Preparation of DPR for Bridges in Saharsa District in the state of Bihar
82 Geotechnical Investigation for structure of Beawar - Gomti Section of NH - 8 in the state of Rajasthan.
83 Geotechnical Investigation of for development of Seoni-Katangi Road (SH-54) in the state of Madhya Pradesh on BOT Basis (Length of Project Road - 75 Km).
84 Geotechnical Investigation of for Preparation of DPR for 3 Major Bridges in Silvassa, Dadra & Nagar Haveli.
85 Geotechnical Investigation for Preparation of DPR for 4 Major Bridges in Daman.
86 Geotechnical Investigation for the proposed 4.8 km long tunnel on SPUR alignment of Mumbai - Vadodara Expressway
87 Pavement Investigation and Materials Survey for Consultancy Services for Preparation of Detailed Project Report for BRTS Corridor (Mukundpur to Kondli) in Delhi.
88 Geotechnical Investigation for Bridges on Damoh - Hirapur Section in the state of Madhya Pradesh
89 Geotechnical Investigation Hazaribagh - Ranchi Section of NH-33 from Km. 40.500 to Km. 114.00 in the state of Jharkhand under NHDP Phase III on BOT (Annuity) Basis.
90 Geotechnical Investigation for the Preliminary Design for Development of Road Corridors and city bypass in Jamshedpur, Jharkhand through Public Private Partnership (PPP).
91 Geotechnical Investigation & Testing of Soil Samples at two toll plaza locations of Moradabad - Bareilly section of NH-24 in the state of Uttar Pradesh.
92 Geotechnical Investigation & Testing of Soil and Rock Samples for Major Bridge Km. 85.810 (Damodar River Bridge) of Hazaribagh-Ranchi section of NH-33 in the state of Jharkhand.
93 Geotechnical Investigation for Agra-Aligarh Road Project (from Chainage 0.000 Km to CH. 79.00Km Section NH-93)
94 Geotechnical Investigation for Jaipur Ring Road from Ajmer Road to Agra Road Section at Jaipur in the state of Rajasthan on DBFOT (Toll) Basis Project
95 Geotechnical Investigation for up-gradation to Two lane with paved configuration of Chapra -Gopalganj section of NH-85 in the state of Bihar
96 Geotechnical Investigation for consultancy services for detailed engineering for Four lanning of Patna - Bakhtiyarpur section of NH-30 from Km. 181.300 to Km. 231.950 in the state of Bihar under NHDP III on DBFOT Toll basis.
97 Material Investigation for BarwaAdda-Panagarh Section of NH-2
98 Geotechnical Investigation for Four Laning of Meerut Bulandshahr Section of NH-235 from Km. 7.469 to Km. 66.482 in the state of Uttar Pradesh
99 Geotechnical Investigation for Development and Peration&Maintenace of 'Ropar - Chamkaur Sahib - NeelonDoraha (up to NH-1) Road" on Design, Build, Finance, Operate & Transfer (DBFOT) basis in the state of Punjab.
100 Geotechnical Investigation for Six laning of Gurgaon-Katputly-Jaipur section NH-8 in state of Rajasthan.
101 Geotechnical Investigation for Design and Engineering Consultancy Services for Four laning of Delhi - Sharanpur - Yamunotri Road up to Uttarakhand Border from km. 10.911 to km. 217.000 in the state of Uttar Pradesh (SH-57) on Design, Build, Finance, Operate and Transfer (DBFOT) basis - Design Consultancy for Package IIIA , Package IIIB, Package I-F, Package I-E, Package I-D
102 Geotechnical Investigation for preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lanes / 2 lane with Paved Shoulders configuration of Narkanda - Wangtoo section (km. 224 to 335) of NH-22 in the state of Himachal Pradesh
103 Geotechnical Investigation for preparation of feasibility cum preliminary study for Udaipur Bypass, Between NH-76 & NH-8 in State of Rajasthan
104 Geotechnical Investigation for Preparation of DPR for Rehabilitation and Upgrading to 2-Lane of NH-87 Ext. Km. 0/0 to 109/0, from Jeolikot-Ghigarikhal.
105 Determination of Compaction of compacted earth embankment layers by standard tests on Yamuna Expressway Between Km. 57.00 to Km. 165.00
106 Sub Soil Investigation for the Project ' Consultant for Determining the suitability and feasibility of PPP Transaction and to implement agreed transactions between Uttar Pradesh State Highways Authority and the Concessionaire for State Highways in Uttar Pradesh:- Delhi - UP Boreder at Loni to UP-Uttarakhand Border of SH-57 Length=206.089"
107 Geotechnical Investigation & Testing of Soil Sample and Rock Samples of existing road section from Moradabad to Bareilly of NH-24 (Between existing Km. 148.00 to 262.00) in the state of Uttar Pradesh.
108 Geotechnical Investigation for Six Lanning of Indore Dewas section of NH-3 from Km. 577.550 to Km. 610.000 and from Km. 0.000 to Km. 12.600 of National Highway No. 3 in the State of Madhya Pradesh.
109 Geotechnical Investigation for preparation of feasibility cum preliminary design for construction of standalone ring road / bypass in Indore City in the state of Madhya Prasesh under NHDP Phase-VII.
110